Layher public bridge
Infra
To convey flows of public safely from A to B a road or waterway sometimes needs to be crossed. In which case a bridge is constructed with stairways and special Layher Allround scaffolding bridge trusses.
The height is variable; the width is a minimum of 2 meters and can be made wider in increments of 2 meters. A clear span of 20 meters is possible; for large spans a column is introduced at the mid-point. The bridge can be supplied with a grill or stage floor.
You can see a good example of a public bridge at the NC Hydrocycling and Harbour Run.
- Variable heigth
- Width from 2 metres
- With grill or stage floor